What to record
- Collect coating and cleaner records, spill history and dated photographs.
- Show peeling, worn wheel paths and joints separately.
- Label unavailable information as unknown.
The decision to discuss
Ask which treatments must be removed and what moisture evaluation applies to the selected system. New gloss should not be presented as proof that the previous failure's cause was resolved.
Why the surrounding context matters
Moisture requirements depend on the selected flooring or surface system. Keep reported test methods, locations and results with the proposal. A dry-looking photograph and a documented evaluation answer different questions; neither should be described as the other.
Further background: NRMCA: concrete slab moisture. This general background does not diagnose your property.
Local reference for Hinesburg
Hinesburg publishes separate forms for new structures, changes of use and development-review applications. See Hinesburg application instructions.
Describe the proposed concrete work and accompanying property changes before choosing an application. The local office can identify the appropriate process from the actual scope; this guide does not determine whether a permit is required.

Send the town, approximate size and access details with wide views and close-ups. Photos help us route the inquiry; we confirm the project scope before booking.