What to record
- Share existing flooring and adhesive information, leak history and the room's normal environmental conditions.
- Keep tests identified by method, date and location.
- Describe any planned change in heating or ventilation.
The decision to discuss
Ask whether additional testing or preparation is required before installation. A result acceptable to one product may not establish suitability for another. Keep concrete repair, flooring installation and water-management work distinct in the proposal.
Why the surrounding context matters
Moisture requirements depend on the selected flooring or surface system. Keep reported test methods, locations and results with the proposal. A dry-looking photograph and a documented evaluation answer different questions; neither should be described as the other.
Further background: NRMCA: concrete slab moisture. This general background does not diagnose your property.

Send the town, approximate size and access details with wide views and close-ups. Photos help us route the inquiry; we confirm the project scope before booking.