What to record
- Share the slab's age, known vapor-retarder information and any earlier coating failure.
- Identify whether the space is conditioned during normal use.
- Keep test locations and reported results with the proposal.
The decision to discuss
Ask which test method and acceptance criteria apply to the selected system. A single observation or generic number should not replace the actual manufacturer's requirements. Separate testing, concrete repair and coating work in the scope.
Why the surrounding context matters
Moisture requirements depend on the selected flooring or surface system. Keep reported test methods, locations and results with the proposal. A dry-looking photograph and a documented evaluation answer different questions; neither should be described as the other.
Further background: NRMCA: concrete slab moisture. This general background does not diagnose your property.

Send the town, approximate size and access details with wide views and close-ups. Photos help us route the inquiry; we confirm the project scope before booking.